Commercial Landscape Architect in Irvine

Evergreen Design Group is a commercial landscape architect serving Irvine with a fully remote team and California Landscape Architect License 7158. We work for land developers, civil engineering firms, architects, and design-build contractors. We do not take homeowner work.

Irvine runs on master plans, one dominant water district, and a plan check process built for finished landscape. The City’s Development Engineering group reviews landscape improvement plans signed by a licensed landscape architect. Irvine Ranch Water District (IRWD) governs recycled water. The Orange County Fire Authority (OCFA) approves fuel modification at the open space edge. Your plans answer all three.

Our licensed staff prepares land planning studies, planting plans, irrigation designs, tree disposition plans, amenity plans, and hardscape plans in-house. You work with one team and receive one coordinated set, ready to sit beside your civil and architectural plans. Our Orange County landscape architect page covers conditions across the county, and this page covers Irvine’s own rules. Read more on our California landscape architect page.

Landscape Architecture Firm in Irvine, CA

Who We Work With and What You Build in Irvine

Land developers bring us in during feasibility and entitlement, when open space, paseos, and street frontage still move. Civil engineering firms share base files with us so grading, drainage, and utility conflicts get settled before plan check. Architects need planting and hardscape sheets matched to the building footprint, fire access, and ADA routes. Design-build contractors want construction documents with clear quantities for accurate pricing.

Multifamily and mixed-use projects dominate current demand. The Irvine Business Complex is converting from office and industrial uses to urban neighborhoods, and the UCI Research Park is shifting the same way. The Irvine Company’s Academy Point site moved from a planned 532,000 square foot life science campus to a 1,200-unit apartment project, with an estimated 14 months of entitlement to change the zoning (Orange County Business Journal).

Office parks in Spectrum and the Airport Area, life science and medical campuses, retail centers, hospitality, and university-adjacent projects round out the work. The Great Park neighborhoods and the older villages add community association and master developer review on top of City review.

Local Development Conditions Behind Your Scope

These conditions drive scope, fee, and schedule on Irvine projects. We address them at the site plan stage, before your civil engineer locks the layout.

Landscape improvement plan submittal

Irvine's Development Engineering Department checks landscape improvement plans. A submittal needs an application, a plan check fee, a construction permit form, three sets of plans signed by a licensed landscape architect, irrigation pressure-loss calculations, the approved case plans with the signed resolution and conditions, and a completed MWELO requirements form. Submittals must be complete and final. Partial submittals go back unless the City Engineer approves them (City of Irvine).

Standard Condition 3.32 requires landscape and irrigation plans conforming to Zoning Ordinance Chapter 3-15 (Landscaping Standards) and Title 5, Division 7 of the Municipal Code before building permit issuance (Standard Conditions). We read your project's conditions of approval first, so the sheets answer each one by number.

Acceptance, maintenance period, and final inspection

Irvine accepts landscape work in three phases. A pre-maintenance inspection needs the landscape architect's certificate of compliance, with the developer, contractor, and landscape architect on site. A 60-day maintenance period follows, with weekly inspections plus two scheduled ones at 30 days and 10 days before the period ends. A final inspection ends in written acceptance. Minor corrections after the first inspection carry a 30-day deadline (City of Irvine Bulletin 111). Plan the contractor's schedule and the owner's maintenance contract around those 60 days.

MWELO, turf, and water budgets

Irvine's MWELO form treats landscape under 500 square feet as exempt. Projects from 500 to 2,500 square feet fall in Category A, and projects over 2,500 square feet fall in Category B. The form states non-residential sites cannot use turf unless recycled water irrigates the turf. At final inspection, you provide a certificate of compliance, a certificate of completion, an irrigation schedule, and a maintenance schedule (City of Irvine Form 40-81). We prepare the water budget and hydrozone plan with the irrigation design, so the numbers match the sheets.

Starting January 1, 2028, California bars potable water irrigation of nonfunctional turf on commercial, industrial, and institutional properties. HOA common areas follow on January 1, 2029. Turf irrigated with recycled water falls outside the ban, and turf used for recreation or gathering stays allowed (MWDOC). Our guides cover AB 1572 for developers and design teams and for existing commercial properties.

IRWD recycled water and budget-based rates

The City's Bulletin 180 requires new residential and non-residential developments to install both potable and recycled supply systems where disinfected tertiary recycled water is available from a municipal source. Waivers depend on proximity and cost-effectiveness. IRWD approves cross-connection testing before final approval or occupancy, and landscape projects also need an irrigation coverage test. The City and IRWD review plans in parallel, and both stamp the permit (City of Irvine Bulletin 180).

IRWD reports recycled water irrigates about 80% of public and commercial landscapes in its service area, through more than 500 miles of purple pipe and more than 6,000 metered connections (IRWD). Rates effective July 1, 2026 use four budget tiers. Potable water costs $2.18 per CCF in the first tier and $19.32 in the fourth. Recycled water costs $1.45 and $10.46 in the same tiers (IRWD rates). Overspending the budget costs real money, so plant selection and controller settings matter to your owner's operating cost.

Tree removal and replacement

Irvine requires a removal permit for right-of-way trees, including trees in medians and in paseo or open space areas next to homes and buildings. The requirement also covers significant trees under the code, such as eucalyptus windrows, along with parking lot and boundary trees. The City requires replacement in some cases, and applicants state the type, number, and gallon size of replacement trees or explain why none are planned (City of Irvine). A tree disposition plan documents each tree and the reason for each decision, so the permit reviewer finds answers in one place.

Parking lots and boundary trees

Irvine requires a Parking Lot Modification when an owner resurfaces, re-stripes, or re-grades a lot, or alters its landscaping. The applicant shows compliance with landscape coverage, which varies by zoning district. Boundary trees fall under Zoning Ordinance Section 3-15-4, and parking lot trees fall under Section 3-15-5. Applications go through the IrvineReady! portal, with a completeness check in about 2 business days and plan check in about 5 business days (City of Irvine). Confirm the current text of each section before you lock a tree count. We specify structural soil solutions for trees within paved areas so parking lot trees reach full size.

Irvine Business Complex overlay

The Irvine Business Complex covers about 2,700 acres between John Wayne Airport and San Diego Creek. The City adopted the IBC Residential Mixed-Use Overlay to convert the area to urban mixed use, and the Vision Plan calls for parks, the San Diego Creek Creekwalk, and pedestrian-oriented streets in place of superblocks (City of Irvine). The overlay allows a maximum of 15,000 units at 30 units per acre minimum, with a 75-foot height limit, and residential requires a conditional use permit. The park standard is 3 acres per 1,000 residents, with 2 public and 1 private. Roof gardens and some courtyards earn open space credit (City of Irvine Form 43-64). Podium decks and courtyards carry real weight in this district, so we design them as part of the open space count from day one.

Fuel modification at the open space edge

Standard Condition 2.17 requires a fuel modification plan for lots next to open space, prepared with OCFA, and OCFA approval is mandatory. Standard Condition 3.14 requires CC&R language sending plant changes in fuel modification zones through Director approval and OCFA requirements (Standard Conditions).

OCFA Guideline C-05 sets a standard 170-foot fuel modification area in three zones. Zone A is 20 feet minimum. Zone B runs 50 to 150 feet and is irrigated. Zone C/D covers 0 to 100 feet of thinned natural vegetation. A licensed landscape architect or equivalent professional prepares the plan from the approved plant list, and prohibited species include chamise, cypress, eucalyptus, palms, and pines. Conceptual plans go in with environmental review or before tract map approval, and precise plans go in before the planting plan or building permit is approved. OCFA approves first, and three inspections follow: vegetation clearance, final fuel modification, and owner turnover (OCFA Guideline C-05).

Stormwater

Orange County splits stormwater permits into a north area under the Santa Ana Regional Water Board and a south area under the San Diego Regional Water Board, with separate model WQMPs. The county's technical guidance sets a retention-first hierarchy of on-site retention, then on-site biotreatment, then subregional or regional options (Orange County Technical Guidance Document.pdf)). Irvine Standard Condition 2.11 requires a WQMP with BMPs and full-capture systems meeting the statewide Trash Provisions, and Condition 2.10 requires a Notice of Intent for disturbance of 1 acre or more. Bioretention areas are planting areas. Your civil engineer sizes the facilities, and we design the soil, plants, and irrigation inside them.

Airport land use

The Airport Land Use Commission for Orange County reviews land use proposals near John Wayne Airport. Projects over 200 feet or penetrating the 100:1 notification surface need FAA Form 7460-1 and ALUC approval (Orange County ALUC staff report). Rooftop and podium plans in the airport area follow the same height limits as the building, so we coordinate tree and equipment heights with your architect.

Entitlement, design review, and plan check

The Planning Commission approves use permits, conditional permits, variances, and adjustments, and meets the first and third Thursday of each month at 5:30 p.m. (City of Irvine). A conditional use permit package includes a site plan, a landscape plan, civil plans, an OCFA service request, and a 500-foot notice list (City of Irvine CUP checklist). We format each set for the reviewing group and answer planning, engineering, and fire comments together.

Landscape Architecture, Land Planning, and Irrigation Services in Irvine

Land planning site layout and entitlement plan for a commercial development

Our land planning in Irvine starts at feasibility. We test site layouts against zoning, overlay standards, open space requirements, and fuel modification zones. Then we prepare conceptual landscape plans, exhibits, and open space calculations for planning review. When staff comments arrive, we answer with your civil engineer and architect, so the City receives one coordinated response.

commercial landscape architecture

As a commercial landscape architect in Irvine, we design entries, courtyards, podium decks, streetscapes, parking field planting, screening, and open space. We design to the Zoning Ordinance and to the maintenance budget your owner will carry. Owners of senior living projects will find more in our guide to senior living landscape design.

Planting plans for Landscape and Screening Code compliance

Planting plans in Irvine balance water budgets, boundary and parking lot tree requirements, and fire-resistant palettes at the open space edge. We select plants for the water source on your site, potable or recycled, and for the crew who will maintain them.

Site tree survey and ordinance compliance

Tree disposition plans in Irvine document species, size, and condition for each regulated tree, including windrows, boundary trees, and parking lot trees. They then show removals, preservation, protection, and replacement. Sequence matters, so read our guide on who should conduct your tree survey before you order one.

Community amenity design for multifamily and master-planned communities

Amenity plans in Irvine cover pool courts, fitness areas, courtyards, event lawns, dog parks, and rooftop gathering spaces for multifamily, mixed-use, and campus projects. We coordinate pool equipment, ADA routes, and drainage with your architect and civil engineer before permit submittal.

Hardscape design for commercial projects with impervious surface and water harvesting coordination

Hardscape plans in Irvine detail paving, walls, plazas, seat walls, and site furnishings on the same grading base as the rest of the site. Joint layouts and material choices account for drainage and structural slab loads on podiums.

Irrigation design plan sized to plant material and climate zone for a commercial site

Licensed in-house staff prepare our irrigation design services in Irvine. Scope covers zoned layouts, controller and equipment specifications, flow and pressure calculations, backflow documentation, water budgets, and recycled water systems built to IRWD standards.

Construction documents and consultant coordination

We issue stamped construction documents formatted for Irvine plan check. Sets include planting, irrigation, tree, and hardscape sheets, specifications, and water calculations. We share CAD files with your civil engineer, architect, arborist, and fire consultant, review their submittals for conflicts, and answer plan check comments. For multi-site programs, our program management team keeps standards consistent across projects.

Irvine Districts and Submarkets We Serve

Our team works remotely and serves every part of Irvine. Each district has its own mix of City standards, master developer review, and agency approvals.

Irvine Business Complex

The Irvine Business Complex sits next to John Wayne Airport and San Diego Creek. Mixed-use and multifamily projects under the residential overlay drive demand, and open space credit, podium design, and airport height limits shape the scope.

Irvine Spectrum

Spectrum holds office parks such as Innovation Office Park, Discovery Park, and Irvine Business Center (Irvine Company), plus retail, apartments, and medical and science uses. Office renovation, amenity upgrades, and new multifamily projects drive demand.

UCI Research Park

The UCI Research Park, Planning Area 25, covers about 131 acres next to UCI open space and the 73 freeway. The area is converting to mixed use with up to 2,500 units (Orange County ALUC staff report). Life science, residential, and amenity projects share the site.

Great Park and Great Park Neighborhoods

The former Marine Corps Air Station El Toro now holds the Orange County Great Park and the surrounding neighborhoods. Residential, commercial, and civic projects here involve master developer standards alongside City review.

Irvine Market Place and the Airport Area

The Irvine Company lists Irvine Market Place and the Airport Area among its Orange County office submarkets (Irvine Company). Office, retail, and hospitality projects drive demand, and parking lot and boundary tree rules apply to renovations.

Villages and foothill neighborhoods

Woodbridge, Northwood, Turtle Rock, Orchard Hills, Portola Springs, and the other villages bring community association review to institutional, retail, and senior living projects. Sites next to open space add OCFA fuel modification.

Our team also serves the rest of Orange County, Los Angeles, and San Diego. See the full list of areas we serve.

Irvine Landscape Architect FAQs

Yes for improvement plans. The City’s landscape improvement submittal calls for three sets of plans signed by a licensed landscape architect. Evergreen holds California Landscape Architect License 7158.

Bring us in at site planning, before the civil plan set is far along. Overlay open space credit, fuel modification zones, recycled water mains, and stormwater areas all shape the layout. Settling them early cuts revision cycles during review.

Where disinfected tertiary recycled water is available from a municipal source, Bulletin 180 requires new developments to install both potable and recycled systems. Waivers depend on proximity and cost-effectiveness. Confirm availability with IRWD at the start of design.

Sites next to open space need an OCFA-approved plan under Guideline C-05, with irrigated and thinned zones and a plant list limited to approved species. We plan the zones with the grading and building layout, so the planting plan and the fuel modification plan agree.

Irvine runs a pre-maintenance inspection, a 60-day maintenance period, and a final inspection leading to written acceptance. We prepare the certificate of compliance and attend the inspections with your contractor.

Yes. Subconsultant work for civil engineering and architecture firms is one of our most common structures. We contract with your firm, share CAD files, attend coordination meetings, and deliver sheets formatted for your set.

nt

Discuss Your Irvine Project

Discuss landscape, irrigation, or entitlement support for your Irvine commercial project. Developers, civil engineers, architects, and design-build firms: send us your site location, project type, available base drawings, and your next submittal date. A licensed professional reviews them and replies directly.

Request a proposal or contact our team. Review our credentials in our statement of qualifications.

Get in Touch with Us