Commercial landscape architecture, land planning, and irrigation design for Bay Area mixed-use, multifamily, life science, office, waterfront, and institutional projects in San Francisco, the East Bay, the Peninsula, and the North Bay.

Commercial Landscape Architect in the Bay Area

Evergreen Design Group is a commercial landscape architect serving the San Francisco Bay Area with a fully remote team and California Landscape Architect License 7158. We work for land developers, civil engineering firms, architects, and design-build contractors. We do not take homeowner work.

The Bay Area spans nine counties and more than 100 cities and towns. Each city has its own planning department, tree rules, and plan check process, and regional agencies add review on the shoreline, on stormwater, and on water use. Parcels are tight, land is costly, and reviewers press hard on trees, stormwater treatment, and street frontage. Your landscape plans need to anticipate those reviews.

Our licensed staff prepares land planning studies, planting plans, irrigation designs, tree disposition plans, amenity plans, and hardscape plans in-house. You work with one team and receive one coordinated set, ready to sit beside your civil and architectural plans. For South Bay projects, see our Silicon Valley and South Bay landscape architect page. For statewide work, start with our California landscape architect page.

Landscape Architect Bay Area CA

Who We Work With and What You Build in the Bay Area

Land developers bring us in during feasibility and entitlement, when open space, street frontage, and tree retention still move. Civil engineering firms share base files with us so grading, drainage, and utility conflicts get settled before plan check. Architects need planting and hardscape sheets matched to the building footprint, fire access, and ADA routes. Design-build contractors want construction documents with clear quantities for accurate pricing. Cities, transit agencies, school districts, and special districts expect sheets built to agency standards and procurement rules.

High-density mixed-use and multifamily projects in San Francisco, Oakland, Emeryville, and Berkeley need podium courtyards, roof decks, and streetscapes matched to the building plan. Life science and office campuses in South San Francisco, Mission Bay, Emeryville, and the Peninsula need outdoor work areas, shade, and stormwater treatment on tight pads. Waterfront projects in San Francisco, Oakland, Alameda, Richmond, and Redwood City add shoreline review and public access.

Transit-oriented housing and industrial redevelopment in the East Bay, hospitality and mixed-use projects in the North Bay, and institutional work for campuses and public agencies round out the market. We resolve trees, stormwater, water budgets, and fire requirements on one set of sheets, so you do not trade them against each other at plan check.

Local Development Conditions Behind Your Scope

These conditions drive scope, fee, and schedule on Bay Area projects. We address them at the site plan stage, before your civil engineer locks the layout.

San Francisco street trees and streetscape

San Francisco requires one 24-inch box tree for every 20 feet of lot frontage under Planning Code Section 138.1. Public Works has authority to modify or waive the requirement, and a project then provides sidewalk landscaping or pays an in-lieu fee. Large projects submit a Streetscape Plan to the Planning Department, and Planning has authority to require standard streetscape elements or sidewalk widening as a condition of approval (Better Streets Plan). We lay out street trees, soil volume, and utility corridors together, so required trees survive plan check and construction.

Water budgets and irrigation ordinances

The state water efficient landscape ordinance applies to new construction with 500 square feet or more of landscape area and to rehabilitated landscapes of 2,500 square feet or more (DWR). San Francisco runs its own Water Efficient Irrigation Ordinance for new landscape of 500 square feet or more and modified landscape of 1,000 square feet or more. Applicants submit a planting plan, irrigation plan, soil management report, and grading plan within 100 days after the first construction document is issued, and SFPUC reviews the package (SFPUC). We prepare the water budget and documents with the irrigation design, so the numbers match the sheets.

Stormwater in San Francisco and regionwide

San Francisco's Stormwater Management Ordinance covers new and redevelopment projects creating or replacing 5,000 square feet or more of impervious surface, and smaller projects of 2,500 to 5,000 square feet in separate sewer areas. Separate sewer areas capture and treat the rainfall from a 0.75-inch design storm. Combined sewer areas hold runoff to pre-development rate and volume, or cut runoff by 25 percent on sites already more than half impervious. Projects hold a mandatory pre-application meeting with SFPUC and submit a preliminary and a final Stormwater Control Plan (SFPUC).

Elsewhere in the region, Provision C.3 of the municipal stormwater permit took effect in its current form on July 1, 2023. The threshold for development and redevelopment dropped to 5,000 square feet of impervious surface, and regulated projects manage runoff onsite with low impact development or green stormwater infrastructure (SCVURPPP). Bioretention areas are planting areas. Your civil engineer sizes the facilities, and we design the soil, plants, and irrigation inside them.

Recycled water from EBMUD

East Bay Municipal Utility District recycles water for irrigation, industrial cooling, and toilet flushing, and publishes zone maps for Emeryville, Oakland, Alameda, and the San Ramon Valley. EBMUD notes not every project is eligible and advises developers to review the zone maps and contact the district before a planning document requires recycled water (EBMUD). Confirm availability for your parcel at the start of design, because the answer changes mainline routing, controller selection, and plant palette.

Shoreline review by BCDC

The Bay Conservation and Development Commission holds permit jurisdiction over a 100-foot shoreline band under the McAteer-Petris Act. Projects with federal permits or federal assistance fall under its policies when they affect land or water uses within the band (Bay Planning Coalition). Waterfront sites in San Francisco, Oakland, Alameda, Richmond, and Redwood City need public access, planting, and shoreline edges on the plan from the first concept.

AB 1572 and nonfunctional turf

Starting January 1, 2028, California bars potable water irrigation of nonfunctional turf on commercial, industrial, and institutional properties. HOA common areas follow on January 1, 2029. Turf irrigated with recycled water falls outside the ban, and turf used for recreation or gathering stays allowed (MWDOC). Design new sites without decorative turf on potable water, and expect owners of existing campuses to ask for retrofit plans. Our guides cover AB 1572 for developers and design teams and for existing commercial properties.

Fire and the hillsides

The Oakland and Berkeley hills, Marin, and Sonoma counties carry wildfire review. The California Board of Forestry Zone 0 regulations cover the first five feet around structures in State Responsibility Areas and in Very High Fire Hazard Severity Zones within local responsibility areas. New construction follows the rules from their effective date, and existing buildings phase in over three to five years (Fire Safe Marin). Lawns and low ground covers under three inches and small non-woody plants stay allowed outside the noncombustible band. We plan Zone 0 and the outer defensible space zones with the grading and building layout, before the fire reviewer sends comments.

Trees and entitlement across the region

Tree rules change at every city line. San Francisco regulates street trees through Public Works and Planning. Oakland protects trees under Municipal Code Chapter 12.36 and reviews development-related removals with the project permit. South Bay cities each set their own thresholds, and our Silicon Valley and South Bay landscape architect page covers San Jose, Santa Clara, Sunnyvale, Mountain View, and Cupertino. We prepare the tree disposition plan to the ordinance of the reviewing city.

Planning, building, public works, fire, and the water provider each review different sheets. Specific plans and design guidelines add standards for streetscape, open space, and planting. Conceptual landscape plans support discretionary review, and construction documents go to plan check. We format each set for the reviewing agency.

Landscape Architecture, Land Planning, and Irrigation Services in the Bay Area

Land planning site layout and entitlement plan for a commercial development

Our land planning in the Bay Area starts at feasibility. We test site layouts against zoning, open space, tree retention, shoreline, and stormwater requirements. Then we prepare conceptual landscape plans, exhibits, and open space calculations for planning review. When staff comments arrive, we answer with your civil engineer and architect, so the city receives one coordinated response.

commercial landscape architecture

As a commercial landscape architect in the Bay Area, we design entries, courtyards, podium decks, streetscapes, plazas, parking field planting, and open space. We design to city code and to the maintenance budget your owner will carry. Owners of senior living projects will find more in our guide to senior living landscape design.

Planting plans for Landscape and Screening Code compliance

Planting plans in the Bay Area balance state and local water budgets, street tree requirements, bioretention planting, shoreline conditions, and fire-resistant palettes on hillsides. We select plants for the water source on your site, potable or recycled, and for the crew who will maintain them.

Site tree survey and ordinance compliance

Tree disposition plans in the Bay Area document species, size, and condition for each regulated tree. They then show removals, preservation, protection, and replacement against the ordinance of the reviewing city. Sequence matters, so read our guide on who should conduct your tree survey before you order one.

Community amenity design for multifamily and master-planned communities

Amenity plans in the Bay Area cover pool courts, fitness areas, courtyards, roof decks, dog parks, employee gathering spaces, and outdoor work areas for multifamily, mixed-use, and campus projects. We coordinate pool equipment, ADA routes, and drainage with your architect and civil engineer before permit submittal.

Hardscape design for commercial projects with impervious surface and water harvesting coordination

Hardscape plans in the Bay Area detail paving, walls, plazas, seat walls, and site furnishings on the same grading base as the rest of the site. Joint layouts and material choices account for seismic movement, coastal exposure, and drainage.

Irrigation design plan sized to plant material and climate zone for a commercial site

Licensed in-house staff prepare our irrigation design services in the Bay Area. Scope covers zoned layouts, controller and equipment specifications, flow and pressure calculations, backflow documentation, water budgets, and recycled water systems built to provider standards.

Construction documents and consultant coordination

We issue stamped construction documents formatted for each agency’s plan check. Sets include planting, irrigation, tree, and hardscape sheets, specifications, and water calculations. We share CAD files with your civil engineer, architect, arborist, and fire consultant, review their submittals for conflicts, and answer plan check comments. For multi-site programs, our program management team keeps standards consistent across projects.

Bay Area Cities and Submarkets We Serve

Our team works remotely and serves the whole nine-county region. Each submarket has its own project mix and its own reviewers.

San Francisco

San Francisco work centers on high-density mixed-use, multifamily, life science, and waterfront projects, from Mission Bay and SoMa to the Embarcadero and the southeast waterfront. Street tree requirements, the Streetscape Plan, the Water Efficient Irrigation Ordinance, and the Stormwater Management Ordinance all apply, and SFPUC reviews the last two.

East Bay

The East Bay includes Oakland, Emeryville, Berkeley, Alameda, Richmond, Hayward, Fremont, and Walnut Creek. Projects here run from transit-oriented housing and life science to industrial redevelopment and waterfront sites. EBMUD recycled water zones, Oakland tree rules, shoreline review, and hillside fire review shape the scope.

Peninsula

The Peninsula includes South San Francisco, San Mateo, Redwood City, Menlo Park, and Palo Alto. Life science and office campuses, mixed-use, and bayfront sites drive demand. Provision C.3 stormwater requirements apply, and bayfront parcels add shoreline review.

North Bay

The North Bay includes Marin, Sonoma, and Napa counties, with hospitality, mixed-use, multifamily, and institutional work. Wildfire rules, including Zone 0, shape planting near structures from the first concept.

South Bay

South Bay projects in San Jose, Santa Clara, Sunnyvale, Mountain View, Cupertino, Los Gatos, Milpitas, Morgan Hill, and Gilroy follow different tree ordinances and a different water recycling network. See our Silicon Valley and South Bay landscape architect page for those cities.

Our team also serves San Ramon and the Tri-Valley, Sacramento, and the Central Coast. See the full list of areas we serve.

Bay Area Landscape Architect FAQs

Requirements vary by city and project type, so confirm with the planning or building department. Commercial permit sets typically carry a licensed professional’s stamp, and tree, stormwater, and fire reviewers expect plans from qualified professionals. Evergreen holds California Landscape Architect License 7158.

Bring us in at site planning, before the civil plan set is far along. Street trees, stormwater areas, shoreline setbacks, fire zones, and open space all shape the layout. Settling them early cuts revision cycles during review.

San Francisco applies its own Stormwater Management Ordinance, with SFPUC review and a Stormwater Control Plan, and separate performance standards for combined and separate sewer areas. Other cities follow Provision C.3 of the regional permit. We design the planting and soil for the treatment areas under either system, and we coordinate with your civil engineer on sizing.

Yes. We coordinate shoreline planting, public access, and edge conditions with your civil engineer and your BCDC consultant. Start the shoreline review early, because the 100-foot band shapes the building footprint.

Yes, where recycled water is available. We design on-site systems to the provider’s requirements, including separation from potable lines, signage, and backflow documentation. Confirm availability with EBMUD or your water provider at the start of design.

Yes. Subconsultant work for civil engineering and architecture firms is one of our most common structures. We contract with your firm, share CAD files, attend coordination meetings, and deliver sheets formatted for your set.

Discuss Your Bay Area Project

Discuss landscape, irrigation, or entitlement support for your Bay Area commercial project. Developers, civil engineers, architects, and design-build firms: send us your site location, project type, available base drawings, and your next submittal date. A licensed professional reviews them and replies directly.

Request a proposal or contact our team. Review our credentials in our statement of qualifications.

Get in Touch with Us